How to Choose a Roofer in Quebec
7-criteria weighted table, RBQ verification steps, checklist and traps to avoid.
Updated June 2026Lire en français
1. Selection criteria — weighted scoring
| Criterion | Weight | How to verify | Disqualifying |
|---|---|---|---|
| Valid RBQ licence (subcategory 1.5) | 25% | rbq.gouv.qc.ca — free online search | No licence = immediate rejection |
| Liability insurance (min. $1M) | 20% | Request written proof of insurance | No insurance = immediate rejection |
| References & work photos | 15% | Minimum 3 recent references (< 2 years) | Refusal to provide = red flag |
| Detailed written quote | 15% | Materials, brands, warranties, deadline included | Verbal quote = rejection |
| Labour warranty | 10% | Minimum 5 years recommended for replacement | Less than 2 years = question it |
| Active CNESST coverage | 10% | Ask for CNESST employer number | Without CNESST = legal risk for you |
| Online reviews (Google, HomeStars) | 5% | Minimum 10 reviews, rating > 4/5 | Rating < 3/5 or < 5 reviews = caution |
2. RBQ licence verification — step by step
Free verification at rbq.gouv.qc.ca/verification-licence
- Step 1: Enter the company name or licence number provided by the roofer.
- Step 2: Verify the licence is 'active' and not 'suspended' or 'expired'.
- Step 3: Confirm subcategory: must include 1.5 — Roofing.
- Step 4: Note the expiry date and associated insurance.
- Step 5: If the number doesn't match the company name, ask for an explanation.
3. Common traps to avoid
| Trap | Warning sign | Real risk | How to avoid |
|---|---|---|---|
| 100% payment upfront | "I need 50% now, rest at the end" | Contractor may disappear before finishing | Max 15–20% deposit — balance on completion |
| Storm chasing | Someone knocks after a storm | Artificial urgency, inflated price | Always get 2 comparative quotes first |
| Abnormally low price | Quote 40% below others | Low-quality materials, uninsured labour | Ask for full material list with brands |
| Verbal contract | "A handshake deal" | No legal recourse in dispute | Get everything in writing, signed by both |
| Hidden subcontracting | "My team" is an external crew | Loss of quality control, unclear liability | Ask who will do the work, verify their RBQ |
| Artificial urgency | "If you don't sign today, price goes up" | Rushed decision without comparison | Always take 48–72h to decide |
Related: Roof Replacement · Roof Repair · Find a Roofer · All Guides